Soft Skills Simulation

Soft skills simulation where students find why a project ran late

The Finsimco Soft Skills Simulation gives each student a project that finished 12 weeks late and eight people who all blame the technology. They go through the timeline week by week, put a cause against each one, then total what each cause cost.

  • About 2-3 hours, single-player
  • Finding why a project ran late
  • In-class, online or hybrid delivery

At a glance

Duration

About 2-3 hours

You set every stage timing from the professor panel, so it fits one block or splits across two sessions.

Format

Single-player simulation

Each student works alone and asynchronously, taking the delivery, team and client roles in turn.

Level

Undergraduate to MBA

Adjustable to the level you teach. The same activity suits a first-year class or an MBA group.

Professor tools

Timeline and session controls

Manage students, adjust stage timings, control progression and monitor individual inputs.

Prerequisites

None

No project experience is assumed. Ownership, handovers and escalation are all explained inside.

Delivery

In class, online or hybrid

The web-based simulation supports in-person, remote, blended and homework-supported delivery.

Assessment

Optional, per student

Every submission is individual, so each student's decisions and reasons export for grading, or run it ungraded.

Course fit

Fits leadership modules

Designed for Leadership, Organisational Behaviour, Project Management and Management courses.

Concepts covered

The topics a professional skills module has to cover: taking ownership of a decision and what happens when nobody does, handing work over when somebody leaves, escalating a disagreement before it costs time, checking an assumption with the person it affects, giving and receiving feedback inside a team, and attributing a delay to a cause rather than to a department.

Diagram from the Soft Skills Simulation showing a project twelve weeks late, split by what caused each week. Eight people at $1,500 a week means every week of delay costs $12,000, so the whole delay costs $144,000. A decision nobody made about who owned the customer data cost 4 weeks and $48,000. A handover nobody did, when the one person who knew the system left, cost 3 weeks and $36,000. Two teams who stopped talking after a disagreement in week 3 cost 2 weeks and $24,000. An assumption nobody checked with the client cost 1 week and $12,000. The technical problem everybody blamed cost 2 weeks and $24,000. Ten of the twelve weeks, worth $120,000, had nothing to do with the technology, and each of the four non-technical causes cost less than an hour to prevent: naming an owner, booking a handover, having one conversation and sending one email. The two technical weeks got every meeting and the other ten were never on an agenda, and nothing here needed a better engineer.

Learning outcomes

Written to drop into your module descriptor without rewriting. On completing the simulation, your students will be able to:

  • Attribute a project delay to specific causes week by week.
  • Calculate what a week of a team's time costs.
  • Distinguish a technical cause from a decision nobody took.
  • Identify the point at which an unmade decision should have been escalated.
  • Compare what a delay cost against what preventing it would have cost.
  • Present a delay analysis to a client who was never told it had stopped.

What students do

Each student works alone, holding the delivery, team and client roles in turn. All three want something different from the same twelve weeks, and only one account gets submitted.

Soft Skills Simulation gameflow, five stages. Stage 1 Briefing, Role setup, 20 min: Watch intro video, Read the project, One student holds all three roles, Review role, goals, and success criteria. Materials: briefing docs, the project, role cards. Stage 2 Count The Weeks, Twelve weeks to account for, 55 min: the delivery role read the reports, total the twelve, cost the week; the team role read the notes, mark each stoppage, say what stopped; the client role read the emails, find the four weeks, write the reason. Materials: the timeline, status reports, the team's notes, tool tips. Stage 3 Find The Cause, What actually stopped it, 55 min: the delivery role drop the blame, read the interviews, attribute each week; the team role name the decision, name the handover, name the silence; the client role confirm the four weeks, confirm the assumption, write the reason. Materials: interview notes, cause attribution, prevention cost, live scores. Stage 4 The Project Post-Mortem, Answer for the twelve, 40 min: show the weeks, show the causes, give the account, submit the review. Materials: review questions, cause summary, the final account, review pack. Stage 5 Debriefing, Results and feedback, No limit: review your account, compare the causes, review the costs, reflect on feedback. Materials: winners, completion summary. Total duration about 2-3 hours.

Delivery

Students run the plan, hold the dates, and have spent twelve weeks reporting a technical problem because it is the only cause anybody has written down anywhere.

Team

Students know what actually happened week by week, including the disagreement in week three and the handover nobody booked, and have never been asked about any of it.

Client

Students were waiting on an answer about who owns the customer data for four weeks, and were never told that the project had stopped while it waited.

How it works

Five stages. Students count the weeks, attribute each one, then account for all twelve.

  1. 1

    Briefing

    Stage 1 · 20 min

    briefing docs · the project · role cards

    Students watch the intro video, read a file on a project that was due in twelve weeks and took twenty-four, with eight people on it, and take on all three roles, checking what each one is judged on before any cause is written down anywhere.

  2. 2

    Count the Weeks

    Stage 2 · 55 min

    the timeline · status reports · the team's notes · tool tips

    The twelve weeks get counted. Working as delivery, the student prices eight people at $1,500 a week, which makes every week of delay $12,000 and the whole thing $144,000; as team, marks every week the work actually stopped. Twelve weeks are accounted for.

  3. 3

    Find the Cause

    Stage 3 · 55 min

    interview notes · cause attribution · prevention cost · live scores

    Each week gets a cause. A decision nobody made took four weeks, a handover nobody did took three, two teams who stopped talking took two, an assumption nobody checked took one, and the technical problem took two. Ten of the twelve cost $120,000.

  4. 4

    The Project Post-Mortem

    Stage 4 · 40 min

    review questions · cause summary · the final account · review pack

    Students are asked which four weeks nobody owned, why the technical problem got every meeting while the other ten weeks were never on an agenda, what each of the four would have cost to prevent, and how they would say all of this to a client who was never told the work had stopped.

  5. 5

    Debriefing

    Stage 5 · No limit

    winners · completion summary

    Students review their own attribution, compare the causes identified across the cohort, revisit the costs those causes produced and reflect on the feedback. Winners and the completion summary give you a structure for the discussion.

What the experience looks like

The student interface carries the timeline, the causes and the reasoning. The professor panel carries the timeline, the controls and every individual account.

Count The Weeks

Students work week by week, with the team size, the weekly cost and the running total sitting next to the box they type into, and a written reason required for every week.

Find The Cause

Each row is a cause. The columns put what it cost next to what preventing it would have cost, and four of the five are hours against weeks.

Professor Controls

Your view. Adjust any stage timing, start or stop the session, and compare each student's account with the evidence behind it.

See how this simulation fits your module

Explore the student and professor experience, and discuss timing, setup and syllabus fit.

Where it fits your syllabus

It works best early, before students have been told that teamwork is a skill rather than a cost.

Teach before it

Nothing formal. Ownership, handovers, escalation and checking assumptions are all explained inside the activity.

Where it sits

Early module, typically weeks one to five, and it works well as an opener.

What it sets up

Team formation, feedback, conflict handling, stakeholder communication, and any assessment asking students to reflect on group work.

The leadership course guide sets out where it sits in a full module.

What students get wrong

The three mistakes students make on this topic almost every time. Recognising them is usually the moment the subject lands, and it is the core of the learning science behind it.

1

They blame the technology because it is written down

Twelve weeks of status reports name one cause, so students take it and write the post-mortem around it. The technical problem took two weeks. The other ten are in nobody's report because a decision nobody made leaves no record of itself, which is exactly why it runs for four weeks without anybody noticing it has.

2

They treat a people problem as a soft cost

Two teams who stopped talking cost two weeks, and students describe it as a culture issue to be worked on later. Two weeks of eight people is $24,000, which is a real number in the same column as the licence fees. A delay has one currency, and putting people problems in a different one is how they stay unaddressed for years.

3

They look for one root cause

Students run the five whys on the technical problem and expect it to explain everything. Five separate things went wrong and none of them caused the others: a decision, a handover, a silence, an assumption and a bug. Delays accumulate rather than cascade, which means there is no single fix and five cheap ones.

How to debrief it

The debrief runs itself. Every student sees their results, the cohort comparison and the decisions that produced them, with nothing for you to prepare. If you would rather lead the discussion, these five questions work straight from a slide, and they use what your cohort actually did.

  • Whose account attributed all twelve weeks without blaming a department?
  • Which four weeks had no owner at all?
  • What did each of the four non-technical causes cost to prevent?
  • Did anyone attribute more than two weeks to the technology? From what evidence?
  • If the week-three disagreement had been escalated, what would have changed?

Assess the attribution and the reasoning, not the total

Assessment is optional. Run the simulation ungraded as an applied activity, or use platform data as supporting evidence. Every student generates a week-by-week attribution, a cost per cause, a prevention estimate, a client account and written reasons. Because the simulation is single-player, every input belongs to one named student, so there is no group-work marking to untangle. All of it exports as CSV or PDF, per student, so you can assess reasoning rather than a result.

What professors can assess

  • Whether every one of the twelve weeks is accounted for
  • Whether each cause is evidenced from the interviews rather than assumed

How to interpret the score

  • A tidy single cause is usually the one that was written down
  • Use the leaderboard for cohort comparison, not for grading

On generative AI: written rationales are exactly what marking teams now worry about. Because every rationale here is tied to a week the student attributed inside the platform, with the interview notes sitting next to it, the reasoning can be checked against the evidence rather than taken on trust.

Low risk to try with a class

Students rate it

93% of students rate Finsimco simulations Excellent, across more than 30,000 responses.

You are not on your own

Teaching notes, a setup and facilitation guide and a gameflow diagram come with it, and we support your first delivery directly.

No grading commitment

Run it ungraded the first time. Assessment is optional and can be added once you have seen how your cohort responds.

A bad session is recoverable

Pause or stop at any point and resume later without losing submitted data, so an overrun costs you a timetable slot, not the activity.

What AACSB and AMBA say about simulations

Ron Tuninga, Managing Director for EMEA at AACSB, and Victor Hedenberg, Membership Director at AMBA, on why simulation-based learning belongs in business education. Watch both interviews.

FAQs

Get the course fit sheet

A one-page summary of this simulation, covering stages and timings, roles, concepts, learning outcomes and the debrief questions, plus a full sample teaching pack from one of our live simulations, so you can see exactly what you would be running.

Book a Demo

During the call, we can:

  • Show the student and professor experience
  • Discuss format, timing and syllabus fit
  • Walk through setup, live delivery and optional assessment evidence
  • Answer questions from your module team