Energy Finance Simulation
The Finsimco Energy Finance Simulation gives each student two power plants to choose between, one that burns gas and one that does not. They cost both over 25 years, find the gas price at which they are level, then decide which way to bet.
Duration
You set every stage timing from the professor panel, so it fits one block or splits across two sessions.
Format
Each student works alone and asynchronously, taking the developer, trading and lender roles in turn.
Level
Adjustable to the level you teach. The same activity suits a first-year class or an MBA group.
Professor tools
Manage students, adjust stage timings, control progression and monitor individual inputs.
Prerequisites
Students need to know what an interest rate is. Everything about electricity is explained inside.
Delivery
The web-based simulation supports in-person, remote, blended and homework-supported delivery.
Assessment
Every submission is individual, so each student's decisions and reasons export for grading, or run it ungraded.
Course fit
Designed for Energy Finance, Infrastructure Finance, Corporate Finance and Sustainability courses.
The topics an energy finance module has to cover: the levelised cost of electricity and how a build cost is spread over an asset's life, capacity factors and why a plant is never running all the time, fuel cost and heat rate, the trade-off between capital cost and running cost, commodity price risk over a twenty-five year horizon, and how renewables and conventional generation are actually compared.
Written to drop into your module descriptor without rewriting. On completing the simulation, your students will be able to:
Each student works alone, holding the developer, trading and lender roles in turn. All three want something different from the same two plants, and only one choice gets submitted.
Students cost what each plant takes to build, spread that cost over the twenty-five years it will run for, and say how much electricity each one actually produces.
Students forecast what gas will cost over the life of the plant, and have to say what the forecast is worth given that nobody has ever been right about it.
Students will fund whichever plant has the more certain cash, and treat a fuel bill nobody can forecast as a reason to charge more or to lend less.
Five stages. Students cost both plants, move the gas price, then choose one.
Stage 1 · 20 min
briefing docs · the two plants · role cards
Students watch the intro video, read a file on two 1,000 megawatt plants, one burning gas and one not, both with twenty-five years of life ahead, and take on all three roles, checking what each one is judged on before any plant is costed anywhere.
Stage 2 · 70 min
build costs · capacity factors · running costs · tool tips
Both plants get costed. Working as developer, the student spreads $1,000,000,000 and $1,600,000,000 over twenty-five years at 8%; as trading, turns $4 gas and a heat rate of 7 into $28.00 a MWh of fuel; as lender, reads which cash is certain. Two costs are submitted.
Stage 3 · 75 min
gas price history · cost curves · the crossing point · live scores
The gas price moves. Every $1 adds $7 a MWh because the plant burns 7 MMBtu to make one. At $4 gas the plant costs $52.44 against the wind farm's $60.03; at $6 it costs $66.44. The two are level at $5.08, and the wind farm's cost never moves at all.
Stage 4 · 45 min
board questions · cost summary · the chosen plant · review pack
Students are asked why the cheaper plant to build makes the dearer electricity, what gas price their recommendation needs to be right, what happens to each plant if gas doubles, and how they would answer a board asked to commit for twenty-five years on a fuel forecast.
Stage 5 · No limit
winners · completion summary
Students review their own choice of plant, compare the choices made across the cohort, revisit the costs those choices produced and reflect on the feedback. Winners and the completion summary give you a structure for the discussion.
The student interface carries the costs, the fuel and the reasoning. The professor panel carries the timeline, the controls and every individual choice.
Students work line by line, with the build cost, the annual output and the cost per unit sitting next to the box they type into, and a written reason required for every figure.
Each row is a gas price. The columns put the gas plant next to the wind farm, and one of the two never moves.
Your view. Adjust any stage timing, start or stop the session, and compare each student's choice with the costings behind it.
Explore the student and professor experience, and discuss timing, setup and syllabus fit.
It works best once students have met discounting and need to use it on an asset that runs for twenty-five years.
Interest rates and simple discounting. Capacity factors, heat rates and levelised cost are all explained inside the activity.
Mid to late module, typically weeks six to ten, after capital budgeting and before renewables policy.
Power purchase agreements, carbon pricing, renewable subsidies, energy trading, and any assessment asking students to appraise a generating asset.
The energy finance course guide sets out where it sits in a full module.
The three mistakes students make on this topic almost every time. Recognising them is usually the moment the subject lands, and it is the core of the learning science behind it.
1
The gas plant costs $1,000,000,000 and the wind farm $1,600,000,000, so students recommend the gas plant and are finished in ten minutes. Spread over the electricity each one produces, the build is $19.44 a MWh against $45.03, and then the gas plant adds $28.00 of fuel. The cheaper plant to build makes the dearer power at any gas price above $5.08.
2
Both plants are 1,000 megawatts, so students divide each build cost by the same annual output. The gas plant runs 55% of the time and the wind farm 38%, which is 4,818,000 megawatt hours against 3,328,800. That difference is most of the gap between $19.44 and $45.03 a MWh, and it is the reason nameplate capacity tells you almost nothing about cost.
3
A forecast is needed, students take today's price, and the whole recommendation rests on it without ever being stated. The honest version names the number: this recommendation is right if gas averages under $5.08 for twenty-five years. That is a claim a board can argue with, which is the point of making it, and it turns an appraisal into a decision somebody can own.
The debrief runs itself. Every student sees their results, the cohort comparison and the decisions that produced them, with nothing for you to prepare. If you would rather lead the discussion, these five questions work straight from a slide, and they use what your cohort actually did.
Assessment is optional. Run the simulation ungraded as an applied activity, or use platform data as supporting evidence. Every student generates two cost build-ups, an annual output figure, a crossing price, a recommendation and written reasons. Because the simulation is single-player, every input belongs to one named student, so there is no group-work marking to untangle. All of it exports as CSV or PDF, per student, so you can assess reasoning rather than a result.
On generative AI: written rationales are exactly what marking teams now worry about. Because every rationale here is tied to a figure the student calculated inside the platform, with the build cost and the capacity factor sitting next to it, the reasoning can be checked against the arithmetic rather than taken on trust.
93% of students rate Finsimco simulations Excellent, across more than 30,000 responses.
Teaching notes, a setup and facilitation guide and a gameflow diagram come with it, and we support your first delivery directly.
Run it ungraded the first time. Assessment is optional and can be added once you have seen how your cohort responds.
Pause or stop at any point and resume later without losing submitted data, so an overrun costs you a timetable slot, not the activity.
Read what lecturers say.
Ron Tuninga, Managing Director for EMEA at AACSB, and Victor Hedenberg, Membership Director at AMBA, on why simulation-based learning belongs in business education. Watch both interviews.
If this one is not quite right for your module, these are the closest alternatives.

Deciding whether to build either plant.
Learn More
Discounting twenty-five years of output.
Learn More
Borrowing the billion to build it.
Learn More
Funding the plant on its own cash.
Learn More
The gas price everything turns on.
Learn More
Raising the money for the wind farm.
Learn MoreA one-page summary of this simulation, covering stages and timings, roles, concepts, learning outcomes and the debrief questions, plus a full sample teaching pack from one of our live simulations, so you can see exactly what you would be running.