Energy Finance Simulation

Energy finance simulation where students choose a power plant

The Finsimco Energy Finance Simulation gives each student two power plants to choose between, one that burns gas and one that does not. They cost both over 25 years, find the gas price at which they are level, then decide which way to bet.

  • About 3-4 hours, single-player
  • Costing two plants over 25 years
  • In-class, online or hybrid delivery

At a glance

Duration

About 3-4 hours

You set every stage timing from the professor panel, so it fits one block or splits across two sessions.

Format

Single-player simulation

Each student works alone and asynchronously, taking the developer, trading and lender roles in turn.

Level

Undergraduate to MBA

Adjustable to the level you teach. The same activity suits a first-year class or an MBA group.

Professor tools

Timeline and session controls

Manage students, adjust stage timings, control progression and monitor individual inputs.

Prerequisites

Interest rates

Students need to know what an interest rate is. Everything about electricity is explained inside.

Delivery

In class, online or hybrid

The web-based simulation supports in-person, remote, blended and homework-supported delivery.

Assessment

Optional, per student

Every submission is individual, so each student's decisions and reasons export for grading, or run it ungraded.

Course fit

Fits energy finance modules

Designed for Energy Finance, Infrastructure Finance, Corporate Finance and Sustainability courses.

Concepts covered

The topics an energy finance module has to cover: the levelised cost of electricity and how a build cost is spread over an asset's life, capacity factors and why a plant is never running all the time, fuel cost and heat rate, the trade-off between capital cost and running cost, commodity price risk over a twenty-five year horizon, and how renewables and conventional generation are actually compared.

Diagram from the Energy Finance Simulation comparing a gas plant and a wind farm, each 1,000 MW and costed over 25 years at 8%. The gas plant costs $1,000,000,000, runs 55% of the time for 4,818,000 MWh a year, so the build is $19.44 a MWh; it burns 7 MMBtu to make a MWh, so fuel at $4 gas is $28.00 a MWh, and running it is $5.00, giving $52.44 a MWh. The wind farm costs $1,600,000,000, runs 38% of the time for 3,328,800 MWh a year, so the build is $45.03 a MWh, there is no fuel at all, and running it is $15.00, giving $60.03 a MWh. Every $1 the gas price rises adds $7 a MWh, so the two are level at $5.08 a MMBtu. At $4 gas the gas plant is cheaper by $7.59 a MWh and at $6 gas the wind farm is cheaper by $6.41. The cheaper plant to build is the dearer power, and one plant is a bet on a fuel price while the other is a bet on an interest rate, because a power station is bought once and fuelled for twenty-five years.

Learning outcomes

Written to drop into your module descriptor without rewriting. On completing the simulation, your students will be able to:

  • Spread a plant's build cost across the electricity it will produce.
  • Calculate a capacity factor and the annual output it implies.
  • Convert a fuel price and a heat rate into a cost per unit of electricity.
  • Compare two plants on total cost rather than on build cost.
  • Identify the fuel price at which two generating options are level.
  • Defend a generation choice to lenders who will not price an unknown fuel bill.

What students do

Each student works alone, holding the developer, trading and lender roles in turn. All three want something different from the same two plants, and only one choice gets submitted.

Energy Finance Simulation gameflow, five stages. Stage 1 Briefing, Role setup, 20 min: Watch intro video, Read the two plants, One student holds all three roles, Review role, goals, and success criteria. Materials: briefing docs, the two plants, role cards. Stage 2 Cost Both Plants, Twenty-five years each, 70 min: the developer role read the build cost, spread it 25 years, divide by the output; the trading role set the gas price, apply the heat rate, cost the fuel; the lender role read the certainty, price the risk, write the reason. Materials: build costs, capacity factors, running costs, tool tips. Stage 3 Gas Doubles, The fuel price moves, 75 min: the developer role hold the build cost, read the crossing, compare the two; the trading role run gas at $6, run gas at $8, find the level price; the lender role test both plants, price the exposure, write the reason. Materials: gas price history, cost curves, the crossing point, live scores. Stage 4 The Build Decision, Answer for the choice, 45 min: show the two costs, show the crossing, choose the plant, submit the review. Materials: board questions, cost summary, the chosen plant, review pack. Stage 5 Debriefing, Results and feedback, No limit: review your choice, compare the plants, review the costs, reflect on feedback. Materials: winners, completion summary. Total duration about 3-4 hours.

Developer

Students cost what each plant takes to build, spread that cost over the twenty-five years it will run for, and say how much electricity each one actually produces.

Trading

Students forecast what gas will cost over the life of the plant, and have to say what the forecast is worth given that nobody has ever been right about it.

Lender

Students will fund whichever plant has the more certain cash, and treat a fuel bill nobody can forecast as a reason to charge more or to lend less.

How it works

Five stages. Students cost both plants, move the gas price, then choose one.

  1. 1

    Briefing

    Stage 1 · 20 min

    briefing docs · the two plants · role cards

    Students watch the intro video, read a file on two 1,000 megawatt plants, one burning gas and one not, both with twenty-five years of life ahead, and take on all three roles, checking what each one is judged on before any plant is costed anywhere.

  2. 2

    Cost Both Plants

    Stage 2 · 70 min

    build costs · capacity factors · running costs · tool tips

    Both plants get costed. Working as developer, the student spreads $1,000,000,000 and $1,600,000,000 over twenty-five years at 8%; as trading, turns $4 gas and a heat rate of 7 into $28.00 a MWh of fuel; as lender, reads which cash is certain. Two costs are submitted.

  3. 3

    Gas Doubles

    Stage 3 · 75 min

    gas price history · cost curves · the crossing point · live scores

    The gas price moves. Every $1 adds $7 a MWh because the plant burns 7 MMBtu to make one. At $4 gas the plant costs $52.44 against the wind farm's $60.03; at $6 it costs $66.44. The two are level at $5.08, and the wind farm's cost never moves at all.

  4. 4

    The Build Decision

    Stage 4 · 45 min

    board questions · cost summary · the chosen plant · review pack

    Students are asked why the cheaper plant to build makes the dearer electricity, what gas price their recommendation needs to be right, what happens to each plant if gas doubles, and how they would answer a board asked to commit for twenty-five years on a fuel forecast.

  5. 5

    Debriefing

    Stage 5 · No limit

    winners · completion summary

    Students review their own choice of plant, compare the choices made across the cohort, revisit the costs those choices produced and reflect on the feedback. Winners and the completion summary give you a structure for the discussion.

What the experience looks like

The student interface carries the costs, the fuel and the reasoning. The professor panel carries the timeline, the controls and every individual choice.

Cost Both Plants

Students work line by line, with the build cost, the annual output and the cost per unit sitting next to the box they type into, and a written reason required for every figure.

Gas Doubles

Each row is a gas price. The columns put the gas plant next to the wind farm, and one of the two never moves.

Professor Controls

Your view. Adjust any stage timing, start or stop the session, and compare each student's choice with the costings behind it.

See how this simulation fits your module

Explore the student and professor experience, and discuss timing, setup and syllabus fit.

Where it fits your syllabus

It works best once students have met discounting and need to use it on an asset that runs for twenty-five years.

Teach before it

Interest rates and simple discounting. Capacity factors, heat rates and levelised cost are all explained inside the activity.

Where it sits

Mid to late module, typically weeks six to ten, after capital budgeting and before renewables policy.

What it sets up

Power purchase agreements, carbon pricing, renewable subsidies, energy trading, and any assessment asking students to appraise a generating asset.

The energy finance course guide sets out where it sits in a full module.

What students get wrong

The three mistakes students make on this topic almost every time. Recognising them is usually the moment the subject lands, and it is the core of the learning science behind it.

1

They compare the plants on what they cost to build

The gas plant costs $1,000,000,000 and the wind farm $1,600,000,000, so students recommend the gas plant and are finished in ten minutes. Spread over the electricity each one produces, the build is $19.44 a MWh against $45.03, and then the gas plant adds $28.00 of fuel. The cheaper plant to build makes the dearer power at any gas price above $5.08.

2

They forget the plants are not running all the time

Both plants are 1,000 megawatts, so students divide each build cost by the same annual output. The gas plant runs 55% of the time and the wind farm 38%, which is 4,818,000 megawatt hours against 3,328,800. That difference is most of the gap between $19.44 and $45.03 a MWh, and it is the reason nameplate capacity tells you almost nothing about cost.

3

They pick a gas price and treat it as a fact

A forecast is needed, students take today's price, and the whole recommendation rests on it without ever being stated. The honest version names the number: this recommendation is right if gas averages under $5.08 for twenty-five years. That is a claim a board can argue with, which is the point of making it, and it turns an appraisal into a decision somebody can own.

How to debrief it

The debrief runs itself. Every student sees their results, the cohort comparison and the decisions that produced them, with nothing for you to prepare. If you would rather lead the discussion, these five questions work straight from a slide, and they use what your cohort actually did.

  • Which plant did most of the cohort choose, and at what gas price?
  • Why does the cheaper plant to build produce the dearer electricity?
  • What does a capacity factor of 55% against 38% do to the build cost per unit?
  • Did anyone choose gas above $5.08? Can they justify it from the forecast?
  • If the wind farm had cost $1,200,000,000, where would the two be level?

Assess the costings and the reasoning, not the plant chosen

Assessment is optional. Run the simulation ungraded as an applied activity, or use platform data as supporting evidence. Every student generates two cost build-ups, an annual output figure, a crossing price, a recommendation and written reasons. Because the simulation is single-player, every input belongs to one named student, so there is no group-work marking to untangle. All of it exports as CSV or PDF, per student, so you can assess reasoning rather than a result.

What professors can assess

  • Whether the build cost was spread over each plant's own output
  • Whether the recommendation names the gas price it depends on

How to interpret the score

  • A confident answer can rest on an unstated fuel forecast
  • Use the leaderboard for cohort comparison, not for grading

On generative AI: written rationales are exactly what marking teams now worry about. Because every rationale here is tied to a figure the student calculated inside the platform, with the build cost and the capacity factor sitting next to it, the reasoning can be checked against the arithmetic rather than taken on trust.

Low risk to try with a class

Students rate it

93% of students rate Finsimco simulations Excellent, across more than 30,000 responses.

You are not on your own

Teaching notes, a setup and facilitation guide and a gameflow diagram come with it, and we support your first delivery directly.

No grading commitment

Run it ungraded the first time. Assessment is optional and can be added once you have seen how your cohort responds.

A bad session is recoverable

Pause or stop at any point and resume later without losing submitted data, so an overrun costs you a timetable slot, not the activity.

What AACSB and AMBA say about simulations

Ron Tuninga, Managing Director for EMEA at AACSB, and Victor Hedenberg, Membership Director at AMBA, on why simulation-based learning belongs in business education. Watch both interviews.

FAQs

Get the course fit sheet

A one-page summary of this simulation, covering stages and timings, roles, concepts, learning outcomes and the debrief questions, plus a full sample teaching pack from one of our live simulations, so you can see exactly what you would be running.

Book a Demo

During the call, we can:

  • Show the student and professor experience
  • Discuss format, timing and syllabus fit
  • Walk through setup, live delivery and optional assessment evidence
  • Answer questions from your module team