Conflict Resolution Simulation

Conflict resolution simulation where students settle a deadlock

The Finsimco Conflict Resolution Simulation gives each student two teams who have argued about a delivery date for 3 weeks. They cost what each side is asking for, ask the customer what they actually need, then write a settlement.

  • About 3-4 hours, single-player
  • Settling one deadlock between teams
  • In-class, online or hybrid delivery

At a glance

Duration

About 3-4 hours

You set every stage timing from the professor panel, so it fits one block or splits across two sessions.

Format

Single-player simulation

Each student works alone and asynchronously, taking the sales, engineering and customer roles in turn.

Level

Undergraduate to MBA

Adjustable to the level you teach. The same activity suits a first-year class or an MBA group.

Professor tools

Timeline and session controls

Manage students, adjust stage timings, control progression and monitor individual inputs.

Prerequisites

None

No negotiation experience is assumed. Positions, interests and escalation are explained inside.

Delivery

In class, online or hybrid

The web-based simulation supports in-person, remote, blended and homework-supported delivery.

Assessment

Optional, per student

Every submission is individual, so each student's decisions and reasons export for grading, or run it ungraded.

Course fit

Fits leadership modules

Designed for Leadership, Negotiation, Organisational Behaviour and Project Management courses.

Concepts covered

The topics a conflict module has to cover: the difference between a stated position and the interest behind it, how a deadlock forms when two sides argue about the same variable, asking the question that reframes a dispute, what a disagreement costs while it is running, escalation and when to use it, and writing a settlement both sides can be held to.

Diagram from the Conflict Resolution Simulation showing a deadlock about a date. Sales promised a customer 14 features by 1 March, which is ten weeks away. Each feature takes 1.5 engineer-weeks and 1.5 engineers are on it, so one feature takes a week: 14 features take 14 weeks and land on 5 April, 8 features take 8 weeks and land inside the deadline, and 5 features take 5 weeks and land five weeks early. Delivering all 14 by 1 March would need 2.1 engineers and only 1.5 are available. The customer's own regulator deadline is 1 March and it needs five named features, not fourteen, with the other nine able to arrive any time that year. The two sides argued about the date for three weeks, which is 4.5 engineer-weeks, or three features that were not built while they argued. Neither side was lying and neither would move, because they were arguing about when and the customer cared about which. A deadlock usually means both sides are arguing about the same wrong number, and the person who is not in the room is the one with the answer.

Learning outcomes

Written to drop into your module descriptor without rewriting. On completing the simulation, your students will be able to:

  • Convert a stated position into the work it would actually take.
  • Distinguish a position from the interest behind it.
  • Calculate what a running disagreement costs in delivered work.
  • Identify the variable both sides are wrongly arguing about.
  • Design a settlement that meets the real requirement on both sides.
  • Defend a settlement to a sales team that has already promised a date.

What students do

Each student works alone, holding the sales, engineering and customer roles in turn. All three want something different from the same ten weeks, and only one settlement gets submitted.

Conflict Resolution Simulation gameflow, five stages. Stage 1 Briefing, Role setup, 20 min: Watch intro video, Read the dispute, One student holds all three roles, Review role, goals, and success criteria. Materials: briefing docs, the dispute, role cards. Stage 2 State The Positions, What each side is asking, 70 min: the sales role read the promise, hold the date, show the contract; the engineering role read the estimates, total the weeks, offer eight; the customer role stay silent, wait for a call, write the reason. Materials: the email chain, the contract, engineering estimates, tool tips. Stage 3 Ask The Customer, The question nobody asked, 75 min: the sales role make the call, ask which five, stop defending; the engineering role cost the five, find week five, plan the nine; the customer role name the five, give the reason, write the reason. Materials: the customer call, the regulator deadline, feature list, live scores. Stage 4 The Settlement, Answer for the three weeks, 45 min: show the positions, show the need, write the settlement, submit the review. Materials: meeting questions, position summary, the settlement, review pack. Stage 5 Debriefing, Results and feedback, No limit: review your settlement, compare the answers, review the cost, reflect on feedback. Materials: winners, completion summary. Total duration about 3-4 hours.

Sales

Students promised a customer fourteen features by 1 March, have it in writing, and will not reopen a commitment made to the biggest account the company has.

Engineering

Students have 1.5 engineers on it and know fourteen features take fourteen weeks, have offered eight by the deadline, and will not sign up to a date the arithmetic refuses.

Customer

Students have a regulator deadline of 1 March, need five named features by then, and have never been asked which of the fourteen those five are.

How it works

Five stages. Students cost both positions, ask the customer, then settle it.

  1. 1

    Briefing

    Stage 1 · 20 min

    briefing docs · the dispute · role cards

    Students watch the intro video, read a file on three weeks of emails between a sales team and an engineering team about a delivery date, and take on all three roles, checking what each one is judged on before anything is settled anywhere.

  2. 2

    State the Positions

    Stage 2 · 70 min

    the email chain · the contract · engineering estimates · tool tips

    Both positions get costed. Working as engineering, the student finds fourteen features at 1.5 engineer-weeks each takes 21 engineer-weeks, which is fourteen weeks for 1.5 engineers; as sales, finds 1 March is ten weeks away. Both positions are submitted.

  3. 3

    Ask the Customer

    Stage 3 · 75 min

    the customer call · the regulator deadline · feature list · live scores

    Somebody finally calls the customer. The deadline is a regulator's and it needs five named features, not fourteen. Five features take 7.5 engineer-weeks, which lands in week five, five weeks early. The other nine can arrive any time that year.

  4. 4

    The Settlement

    Stage 4 · 45 min

    meeting questions · position summary · the settlement · review pack

    Students are asked what each side was actually arguing about, why three weeks of it cost three features that were never built, which question would have ended it on day one, and how they would put a settlement to two teams who have each refused in writing to move.

  5. 5

    Debriefing

    Stage 5 · No limit

    winners · completion summary

    Students review their own settlement, compare the answers reached across the cohort, revisit the costs those answers avoided and reflect on the feedback. Winners and the completion summary give you a structure for the discussion.

What the experience looks like

The student interface carries the positions, the estimates and the reasoning. The professor panel carries the timeline, the controls and every individual settlement.

State The Positions

Students work position by position, with the features, the engineer-weeks and the delivery week sitting next to the box they type into, and a written reason required for every figure.

Ask The Customer

Each row is a version of the deliverable. The columns put when it lands next to whether it meets the requirement, and only one row does both.

Professor Controls

Your view. Adjust any stage timing, start or stop the session, and compare each student's settlement with the estimates behind it.

See how this simulation fits your module

Explore the student and professor experience, and discuss timing, setup and syllabus fit.

Where it fits your syllabus

It works best once students have been in a disagreement nobody could resolve by arguing harder.

Teach before it

Nothing formal. Positions, interests, escalation and the cost of a running dispute are all explained inside the activity.

Where it sits

Mid module, typically weeks four to eight, after team roles and before negotiation.

What it sets up

Negotiation, mediation, difficult conversations, stakeholder management, and any assessment asking students to resolve a dispute.

The leadership course guide sets out where it sits in a full module.

What students get wrong

The three mistakes students make on this topic almost every time. Recognising them is usually the moment the subject lands, and it is the core of the learning science behind it.

1

They try to find a date in the middle

Sales wants 1 March, engineering says 5 April, so students propose mid-March and present it as a compromise. Neither side can deliver mid-March either: fourteen features take fourteen weeks whoever agrees to what. Splitting a difference only works when the difference is a preference, and here one side of it is arithmetic.

2

They decide which side is right

Engineering's estimate is correct and sales made a promise they could not keep, so students write that up and call it resolved. Both of those are true and neither helps. The customer still has a regulator deadline, and a finding about who was at fault produces no features at all by 1 March.

3

They never ask the customer

Three weeks of emails run between two internal teams about a date a third party set, and nobody telephones the third party. The customer needs five named features, which land in week five, five weeks early. The question that ends the dispute takes one phone call, and the reason it is not made is that both sides believe they already know the answer.

How to debrief it

The debrief runs itself. Every student sees their results, the cohort comparison and the decisions that produced them, with nothing for you to prepare. If you would rather lead the discussion, these five questions work straight from a slide, and they use what your cohort actually did.

  • Whose settlement met the regulator deadline and the engineering estimate?
  • What was each side actually arguing about, and what did the customer care about?
  • What did three weeks of arguing cost, in features?
  • Did anyone propose a date in the middle? Can they justify it from the estimates?
  • If the customer had needed ten of the fourteen, what would have changed?

Assess the settlement and the reasoning, not the date

Assessment is optional. Run the simulation ungraded as an applied activity, or use platform data as supporting evidence. Every student generates two costed positions, a customer requirement, a settlement, a cost of delay and written reasons. Because the simulation is single-player, every input belongs to one named student, so there is no group-work marking to untangle. All of it exports as CSV or PDF, per student, so you can assess reasoning rather than a result.

What professors can assess

  • Whether both positions were costed before anything was proposed
  • Whether the settlement names which features and not only when

How to interpret the score

  • A settlement both sides accept can still miss the requirement
  • Use the leaderboard for cohort comparison, not for grading

On generative AI: written rationales are exactly what marking teams now worry about. Because every rationale here is tied to an estimate the student calculated inside the platform, with the email chain and the contract sitting next to it, the reasoning can be checked against the evidence rather than taken on trust.

Low risk to try with a class

Students rate it

93% of students rate Finsimco simulations Excellent, across more than 30,000 responses.

You are not on your own

Teaching notes, a setup and facilitation guide and a gameflow diagram come with it, and we support your first delivery directly.

No grading commitment

Run it ungraded the first time. Assessment is optional and can be added once you have seen how your cohort responds.

A bad session is recoverable

Pause or stop at any point and resume later without losing submitted data, so an overrun costs you a timetable slot, not the activity.

What AACSB and AMBA say about simulations

Ron Tuninga, Managing Director for EMEA at AACSB, and Victor Hedenberg, Membership Director at AMBA, on why simulation-based learning belongs in business education. Watch both interviews.

FAQs

Get the course fit sheet

A one-page summary of this simulation, covering stages and timings, roles, concepts, learning outcomes and the debrief questions, plus a full sample teaching pack from one of our live simulations, so you can see exactly what you would be running.

Book a Demo

During the call, we can:

  • Show the student and professor experience
  • Discuss format, timing and syllabus fit
  • Walk through setup, live delivery and optional assessment evidence
  • Answer questions from your module team